    Construction electromechanical debugging

    The whole-process commissioning technology of architectural electromechanical system covers the scheme design stage, design stage, construction stage and operation and maintenance stage of architectural electromechanical system, and its executors can be undertaken by independent third parties, owners, designers, general contractors or electromechanical subcontractors. At present, the most common is that the owner employs an independent third party consultant, namely, the debugging consultant as the debugging manager.

    Debugging content:
    1) Scheme design stage: the preparatory stage at the beginning of the project, the main objective of commissioning is to define and establish the project requirements of the owner.
    2) Design stage. The main objective of commissioning at this stage is to ensure that the design documents meet and reflect the project requirements of the owner.
    3) Construction stage. The main objective of this phase of commissioning is to ensure that the installation of electromechanical systems and components meets the project requirements of the owner.
    4) Delivery and operation stages. When the project is basically completed, it will enter into the commissioning work in the delivery and operation stage until the end of the warranty contract.

    Technical indicators:
    At present, there is no special specification and guidance for the whole process debugging of building electromechanical system in China, and the work can only be carried out in accordance with the relevant parts of the current design, construction, acceptance and testing specifications.

    The main specifications are as follows:
    Code for design of heating, ventilation and air conditioning in civil buildings  GB50736
    Design standards for energy conservation of public buildings  GB50189
    Code for electrical design of civil buildings  JGJ16
    Code for acceptance of construction quality of ventilation and air conditioning engineering GB50243
    Code for acceptance of construction quality of building energy conservation engineering  GB50411
    Code for acceptance of construction quality of building electrical engineering  GB50303
    Code for acceptance of construction quality of building water supply, drainage and heating engineering  GB50242
    Intelligent building engineering quality acceptance code  GB50339
    Code for construction of ventilation and air conditioning engineering  GB50738
    Public building energy saving test standard  JGJ/T177
    Technical specification for engineering test of heating, ventilation and air conditioning JGJ/T260
    Technical specification for vav air conditioning system engineering  JGJ343

    Scope of application:
    It is suitable for the whole process debugging of electromechanical system of newly-built buildings, especially for the whole process debugging of electromechanical system under general contract.